Gang Aluminium Formwork System Alloy Aluminum A6061-T6 6000 Series for Form Work Designs
Click image to view full size image
Product: Views:327Gang Aluminium Formwork System Alloy Aluminum A6061-T6 6000 Series for Form Work Designs 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-07-24 11:13
  Inquiry
Details
What is the Aluminium Formwork System?

Aluminium Formwork, is a very new technology for construstion industry this years. Aluminium Form work system is already widely used in APAC, System Formwork used in Japan, System Formwork used in Singapore, System Formwork used in Malaysia and the Middle East for construction works very well already, for low rises and also for high rises. Aluminium form work system can save cost for building company, also saves time and improves the quality of construction site.

Aluminum Formwork System is very cost effective building materials. Aluminum Formwork Panels can be designed for any parts and component of building, such as windows, stairs, balconies and special structures. This Alumimiun Formwork Designs are unique because of all the components in the system, including slab floors/wall/columns/beams/staircases/balconies and window hood, are concreted at one time and there is no need for more blockworks or brickworks.

All structure of the building is concreted at one time so we can control the construction quality very well. It makes the form finish, eliminates the need for external and internal plaster and the walls can be directly painted with a minimal skim coat, all these ultimately resulting in cost saving.

Advantages of Aluminium System Formwork
  • Short construct period in average 4-5days/floor

  • 300 reuse times, reduce average project cost                         

  • Easy to use, high efficiency, don’t need workers with high specialized skills

  • Good stability, high bearing up to 60KN/M2

  • High project quality, smooth surface, no need plaster process

  • No construction trash and noise, reduce potential safety risk

  • 80% standard components, can be reused in next project

  • High recycle value, average value up to US$60/M2

  • Eco-friendly, comply with environmental protection requirements

  • Simple supporting system, make the site wide space 

Features of Antai Aluminum Formwork System1)Reuse time: 

Industry standard reuse time up to 300 times for oversea projects

 

Categories

Aluminum   Formwork

Euro   Formwork

Plywood   Formwork

Materials

4.00   mm A6061-T6

Steel+12mmPlywood

18mm Film Faced Plywood

Specifications

600mm/450mm/300mm   X 2,400mm X 65mm

600mmX1200mmX

63.5mmX2sheets

1220mmX2440mmX18mm

Weight

20-25KG/M2

35-40KG/M2

10.5KG/M2

Reuse  Times

300times

50times

8times

Loading

60KN/M3

30KN/M3

30KN/M3

Constructio  Period

4days

8days

10days

Assembly

Easy

Hard

Difficult

Disassembly

36h/floor

72h/floor

168h/floor

Quality   of 

Concrete  Surface

Flat   & Smooth Surface

Flat   Surface

Rough   Surface

2)  Easy to use:
  • Average weight about 20 - 25 kg/m2, only a single worker could move the Aluminum formwork easily.

  • No heavy lifting or cranes are required.

  • Since it is very convenient to use, even a greenhand can be a professional through simple training.

  • Project period short in 4-5 days/floor

 

3)Eco-friendly:
  • Use A6061-T6, the most suitable material for industrial and residential construction.

  • It is a green formwork with low carbon emissions.

  • Reused 300 times make maximized ROI with multiple projects.

  • 80% standard formwork panels could be reused.

  • The Aluminium materials recycle value is up to 30% of the purchase cost.

4)  High quality: 

Antai formwork system has accuracy in 99% for horizontal and 100% for vertical structure.

  • Compared to existing Euro-form, AL formwork has more accuracy in horizontal and vertical structure.

  • The concrete surface flat& smooth.

  • No need heavy backing plaster, effectively for plaster cost saving.

  • Adopts the integrative design, load 60KN/ m2, which could reduce the safety loophole leaded by the construction and materials.

5)Cost saving:

Save much cost than wooden system formwork once turnover 55 times, meanwhile it can reduce labor cost, and cost for transportation of raw materials, material loss, and waste disposal, etc.

Formwork

Aluminium Formwork

Euro-Formwork

Plywood Formwork

Price(USD)

185.00/M2

135.00/M2

25.00/M2

Labor cost(USD)

4.00/M2

4.00/M2

4.66/M2

Machinery cost(USD)

0.00/M2

1.00/M2

0.20/M2

Recycle 30 times cost(USD)

10.16/M2

9.33/M2

9.50/M2

Recycle   60 times cost(USD)

7.08/M2

9.33/M2

9.50/M2

Recycle   90 times cost(USD)

6.05/M2

9.33/M2

9.50/M2

Aluminium Formwork System Introduction1) How does it manufactured?

Billets→Extrusion→Cutting → Punching →Welding→ Coating →Assembly

2) Specifications of AL-Formwork System
  • Raw Material: Aluminium A6061-T6

  • Technical: Extrusion Technology/Dual-Robots Welding technology/Assemble technology

  • Components: Formwork System/Supporting/Accessories

  • Wall Panel Size: 600mm/450mm/300mm X 2,400mm X 65mm

  • Slab Panel Size: 600mm/450mm/300mm X 1,200mm X 65mm

  • Panels System and Supporting System and Accessories System consist of Formwork System

 

                  

3) What integrates AL Formwork System

 

Formwork System


Forms  the closed surface of concrete structure,

ensure the forming structure while concreting

Wall panel

Slab panel

Corner panel

Wall End Panel

 

 

Supporting System

Supporting the concrete 

structure, guarantee the 

slab, beam, cantilever 

structure steady

Prop

Prop Head

Beam

Rocker

Joint Bar

 

Accessories System

The connection components, 

integrate formwork system 

and support system into a 

completed formwork system

Bracket

Round & Long &Wedge Pin

Bracket Bolt & Nut

Kicker Bolt, Nut & Washer

4) Working Period

1st Day

Lining up structural lines and installation of reinforcing bars

2nd Day

Installation of wall panels

3rd Day

Installation of Slab panels

4th Day

Installation of reinforcing bars on the slab panels before casting the concrete